In the beginning, the Jai Hind metro station was planned to get elevated. However, the AAI objected which the elevated stretch up for the airport may possibly pose a risk to plane, Hence the route was further reworked along with the station was shifted underground, one hundred fifty m from the https://railway-kolkata51514.bloggosite.com/40013573/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf