So far, each subsystem continues to be confirmed in Each individual section from LEOP, OCM and daily cruise. During the next period of Mission 1, more verification of each and every subsystem functionality is prepared through both of those the lunar orbit injection and lunar landing phases. ispace Inc. https://202299999.azzablog.com/27863120/ispace-fundamentals-explained